Search  [advanced search]

Technical reports 2000

* Technical Report 661-2000
Frederik Stork and Marc Uetz
Resource-Constrained Project Scheduling: From a Lagrangian Relaxation to Competitive Solutions
* Technical Report 664-2000
Rolf H. Möhring, Andreas S. Schulz, Frederik Stork, and Marc Uetz
On Project Scheduling with Irregular Starting Time Costs
* Technical Report 666-2000
Sándor P. Fekete, Joseph S. B. Mitchell, and Karin Weinbrecht
On the continuous Weber and k-median problems
* Technical Report 667-2000
Sándor P. Fekete and Henk Meijer
Maximum dispersion and geometric maximum weight cliques
* Technical Report 668-2000
Matthias Müller-Hannemann
Improving the Surface Cycle Structure for Hexahedral Mesh Generation
* Technical Report 669-2000
Michael Naatz
A Note on a Question of C. D. Savage
* Technical Report 674-2000
Esther M. Arkin, Michael A. Bender, Erik D. Demaine, Sándor P. Fekete, Joseph S. B. Mitchell, and Saurabh Sethia
Optimal Covering Tours with Turn Costs
* Technical Report 680-2000
Rolf H. Möhring, Andreas S. Schulz, Frederik Stork, and Marc Uetz
Solving Project Scheduling Problems by Minimum Cut Computations
* Technical Report 681-2000
Rolf H. Möhring
Scheduling under Uncertainty: Optimizing Against a Randomizing Adversary
* Technical Report 682-2000
Rolf H. Möhring and Marc Uetz
Scheduling Scarce Resources in Chemical Engineering
* Technical Report 683-2000
Martin Skutella
Convex quadratic and semidefinite programming relaxations in Scheduling
* Technical Report 684-2000
Han Hoogeveen, Martin Skutella, and Gerhard J. Woeginger
Preemptive scheduling with rejection
* Technical Report 685-2000
Martin Skutella
Approximating the single source unsplittable min-cost flow problem
* Technical Report 689-2000
Rolf H. Möhring, Martin Skutella, and Frederik Stork
Scheduling with AND/OR precedence constraints
* Technical Report 691-2000
Martin Skutella and Marc Uetz
Scheduling Precedence-Constrained Jobs with Stochastic Processing Times on Parallel Machines
* Technical Report 692-2000
Cornelia Kober and Matthias Müller-Hannemann
Hexahedral Mesh Generation for the Simulation of the Human Mandible
* Technical Report 693-2000
Frederik Stork and Marc Uetz
On the Representation of Resource Constraints in Project Scheduling
* Technical Report 694-2000
Esther M. Arkin, Sándor P. Fekete, Ferran Hurtado, Joseph S. B. Mitchell, Marc Noy, Vera Sacristán, and Saurabh Sethia
On the Reflexivity of Point Sets
* Technical Report 695-2000
Sándor P. Fekete, Henk Meijer, André Rohe, and Walter Tietze
Solving a "Hard" Problem to Approximate an "Easy" One: Heuristics for Maximum Matchings and Maximum Traveling Salesman Problems
* Technical Report 696-2000
Sándor P. Fekete, Ekkehard Köhler, and Jürgen Teich
Optimal FPGA Module Placement with Temporal Precedence Constraints
* Technical Report 697-2000
Sándor P. Fekete, Ekkehard Köhler, and Jürgen Teich
Extending partial suborders and implication classes
* Technical Report 698-2000
Sándor P. Fekete, Ekkehard Köhler, and Jürgen Teich
More-Dimensional Packing with Order Constraints
* Technical Report 700-2000
Rolf H. Möhring
Scheduling under uncertainty: Bounding the makespan distribution
* Technical Report 702-2000
Frederik Stork
Branch-and-Bound Algorithms for Stochastic Resource-Constrained Project Scheduling
* Technical Report 704-2000
Ekkehard Köhler
AT-free, coAT-free Graphs and AT-free Posets
* Technical Report 705-2000
Ekkehard Köhler
Recognizing Graphs without Asteroidal Triples